Creating valuable

modernisation

Key Achievements

1. Network Performance

Increased network performance and reliability by ~70% through full migration to optical fiber backbone.

2. Telecommunication cost

Reduced telecommunication costs by ~40% following migration from PSTN to VoIP.

3. System downtime

Cut system downtime by ~50% by deploying centralized server virtualization (Hyper-V / Proxmox).

4. PACS

Eliminated film radiography and improved diagnostic accuracy via PACS implementation.

5. LIS

Centralized laboratory operations with LIS, significantly reducing manual errors.

6. NAS

Built NAS-based disaster recovery solution covering 100% of critical healthcare systems.

Open to new opportunities

Feel free to reach out to discuss system administration, IT operations, or infrastructure projects.

contact@vullnetmuaremi.com